Waste Management

 
Minimum 10 Points Required

This section deals with the handling of waste materials on the construction site and encourages recycling.

 

5-1  Comprehensive recycling program during construction for building site including education, site signage and bins (2 points).

Visit the website WhyWasteIt.ca

 

5-3  Suppliers and trades recycle their own waste, including leftover material and packaging (1 point per trade - maximum 4 points).

Polycore Residential Wall System | Polycore Canada Inc.
Polycore Foundation Wall System | Polycore Canada Inc.

Polycore Garage Grade Wall System | Polycore Canada Inc.

Polycore Insulated Sleeper Floor System | Polycore Canada Inc.

 

5-8  Install permanent recycling center for the home owner with two or more bins (for 1 point), or four or more bins (for 2 points).

AIR-KING’S ESB Series Exhaust Fan